Station 3B - Schoellkopf Station, 1919-1920
Scope and Contents
Photographs show the construction of Schoellkopf Station 3B. Photographs include: penstocks, workers, Paul Schoellkopf in a number of photos, workers with turbine runner (Alcoa in background), a drill boat in the canal from the "Great Lakes Dredge and Dock Co.". (#3000-3299). Constructing Schoellkopf Station 3B.
Dates
- 1919-1920
Biographical / Historical
Niagara Falls Power Company and Schoellkopf's Hydroelectric Power and Manufacturing Co. merged in 1918 (kept name Niagara Falls Power Company). 3B was completed in 12/1919.
Extent
From the Collection: 50.0 Linear feet
Language of Materials
From the Collection: English
Processing Information
Some of these photos (those in protective sleeves) were scanned for a 2013 Niagara Falls National Heritage Area (NFNHA) grant.
Creator
- From the Collection: Niagara Mohawk Power Company (Organization)
Repository Details
Part of the Niagara Falls Public Library Local History Repository
1425 Main Street
3rd Floor
Niagara Falls NY 14305 United States
716-286-4899
nflh@nioga.org